Add Time : 2019-10-30
1.In the early stage of equipment project design, our technicians will know clearly about the basic requirements of product production, and design professional scheme to ensure the safety, applicability and reliability.
2. In the design of the equipment, the optimized design scheme is adopted to protect the customer's on-site production environment to the extent, to ensure the customer's efficient and environmentally friendly production.
3. Before the contract is signed, instruct necessary and fully design plan, so that the customer can understand the design detail, which is necessary for decision-making.
4. After the contract is signed, it actively cooperates with the customer's overall project progress, obeys the overall scheduling of the customer's project, and completes the installation and commissioning of the equipment within the time limit stipulated in the contract. Submit the customer acceptance check on time.
Dongding Drying Equipment Co., Ltd. insists on winning the trust of customers with quality and service, and building a win-win situation with credit. If you have any needs in coal drying, please feel free to contact us. We will do a detailed analysis for you to meet your diversified needs.